Sanitation Quality Maintenance Blog Schedule Demo Contact
For Plant Managers

The food safety platform that pays for itself.

MySitesSupervisor replaces three disconnected systems and a paper program with one cloud platform — without the per-user pricing tax that turns enterprise food-safety software into a five-figure annual line item. Built for plant managers who own labor cost, recall risk, and the audit-findings list.

What's on your P&L that shouldn't be

💰

Sanitation labor that's actually paperwork

Roughly 10 minutes per task × 60 tasks × 3 shifts × 7 days = 210 hours/week of paperwork inside your sanitation labor budget. Nobody's tracking it.

⚠️

Recall risk you can't quantify

A single Class I recall costs $10M+ on average. Half of food recalls in 2024 were Listeria-related. Your insurance carrier wants to know what you're doing about it.

📊

Three vendor contracts, three onboardings

Sanitation software, quality software, EMP software — three contracts, three implementations, three vendor renewals to manage. Each one with per-user pricing.

🔍

Audit findings that keep recurring

Same finding, same explanation, same CAPA, same auditor next year. You're paying overtime for audit prep, and the auditor still finds the same gap.

Labor ROI

The labor case is in your sanitation budget today.

We see plants recover 30–50% of pre-op time and 60–80% of audit-prep time after rolling MSS to their sanitation team. That's recurring labor in a budget line you already approved. The software cost is a fraction of the labor you stop spending on paperwork. We'll model your specific plant on the demo if you bring two numbers: tasks/shift and fully-loaded sanitation labor rate.

  • 30–50% reduction in pre-op time per shift
  • 60–80% reduction in audit-prep labor
  • Faster new-hire ramp (hours, not days)
  • Less supervisor time spent on signatures and paperwork chase
MSS dashboard showing sanitation labor metrics and audit-prep efficiency for plant managers
Risk Reduction

Recall risk that actually gets smaller.

Recall risk is a function of how fast a Listeria or Salmonella positive turns into a corrective action across the affected zones. MSS shortens that loop. Positive results auto-trigger vector sampling. CAPAs open automatically. Three-day negative confirmation is tracked. The faster the loop closes, the less product is at risk if something does go wrong.

  • Auto-vector sampling on Listeria/Salmonella positives
  • Auto-CAPA from out-of-spec ATP and missed pre-op
  • Three-day negative confirmation tracking
  • Heat-map view of harborage trends across the facility
MSS facility floor plan showing EMP test points and harborage heat mapping for plant managers focused on recall risk reduction
Vendor Consolidation

One vendor, one renewal, one onboarding.

Most plants we talk to are running three vendors for sanitation, quality, and EMP. Each one charges per user. Each one has its own contract cycle, its own implementation timeline, and its own login. MSS consolidates all three onto one platform with one vendor and one renewal — and includes unlimited users on every plan.

  • Sanitation, Quality, and EMP on one platform (Maintenance coming)
  • Single vendor relationship, single contract renewal
  • Unlimited users — no per-seat pricing
  • Modular: turn on what you need, leave the rest
MSS platform consolidation showing one vendor for sanitation, quality, EMP, and maintenance management in a food manufacturing facility

How MSS pricing actually works

👥

Unlimited users

Every sanitation tech, supervisor, QA lead, plant manager, and exec gets a login. No per-seat tax. No "who has access to this" debates.

🧩

Pay per module

Start with sanitation. Add quality when ready. Add maintenance when it ships. Pay for what you've turned on, not the bundle.

📝

No contracts

No 3-year commitments. No "talk to your account manager." Month-to-month available. Annual gets you a discount.

🚀

Days, not months

Enterprise platforms take a quarter to roll out. MSS is days. Less internal project-management burden, faster ROI.

Want the ROI model for your plant?

Bring two numbers to the demo — tasks per shift and fully-loaded sanitation labor rate — and we'll model your specific labor recovery in real time. 30 minutes. No pressure.