Food plant supervisor using a tablet on the production floor
Sanitation · Quality · EMP · CAPA

Built for the floor. Priced for the whole team.

MySitesSupervisor gives food manufacturing facilities one cloud home for sanitation scheduling, quality testing, environmental monitoring (EMP), pre-op inspections, ATP testing, and CAPA — with unlimited users on every plan and modules you turn on only when you need them.

Unlimited users on every plan
Modular — pay only for what you turn on
Onboarded in days, not months
Built for
🥛Dairy 🥐Bakery & Snack 🥩Meat & Poultry ❄️Cold Storage 🥤Beverage 🧼Contract Sanitation 🐾Pet Food
New · v5.0 MySitesSupervisor 5.0 arrives September 10 — and it teaches itself Watch the 90‑second tour →

One Platform.
So Much More.

The platform you trusted for sanitation management now handles Quality and Maintenance too — and with 5.0, every page has a How to… guide that shows your crew around. Same powerful tools. Bigger vision. Pay only for what you need.

Live 24/7Cloud-Based Access
1,000+Tasks Managed Daily
1 PlatformEndless Capabilities
The MySitesSupervisor 5.0 home page: what's on now, what needs attention, and what's yours — across sanitation, quality and titration
34 of 34 done
Today · Sanitation
12 to approve
Awaiting your approval

Everything Your Facility Needs.
All in One Place.

MySitesSupervisor isn't four separate products — it's one platform with capability areas you can turn on as you need them.

Available Now

Sanitation Management

Master sanitation scheduling, task tracking, auto-scheduling, environmental monitoring, Gantt/calendar/grid views, and 2-click task completion.

See Features
Available Now

Quality Management

Quality testing boards, ATP random testing, pre-op inspections, image documentation, exportable quality reports, and custom test configurations.

See Features
Coming Soon

Maintenance Management

Preventative maintenance scheduling, work orders, equipment lifecycle tracking, and spare parts management. Coming to the platform.

Get Notified

Powerful Tools, Simple Experience

Everything your team needs to manage sanitation, quality, and more — in one intuitive cloud-based platform.

MSS real-time dashboard showing sanitation, quality, and EMP program completion rates for a food manufacturing facility

Real-Time Dashboard

Bird's-eye view of completion rates, task status, and team performance across all your programs.

Master sanitation schedule in MSS Gantt view with drag-and-drop frequency management for food plants

Smart Scheduling

Auto-scheduling with calendar, Gantt, and grid views. Customizable frequencies and drag-and-drop management.

MSS quality testing kanban board with pre-op inspections, ATP random testing, and image documentation

Quality Testing

Kanban-style quality boards, ATP random testing, pre-op inspections, and image documentation.

Facility floor plan in MSS with mapped environmental monitoring (EMP) test points and Zone 1–4 sampling locations

Facility Mapping

Upload facility floor plans and map test points, equipment, and zones for visual monitoring.

Audit-ready sanitation and quality reports in MSS with automated email distribution to QA and plant managers

Reports & Distribution

Pre-built and custom reports with automated email distribution. Always audit-ready.

MSS CAPA workflow with corrective and preventive action tracking, root cause analysis, and photo evidence

CAPA Management

Track corrective and preventative actions with root cause analysis, follow-ups, and verification.

Automate Your Entire Sanitation Schedule

Create, track, and monitor all your sanitation tasks from one centralized system. View your schedule in calendar, Gantt, or grid mode — whatever works best for your team.

  • Highly customizable schedule frequencies
  • Calendar, Gantt, and grid view options
  • Import / export functionality
  • 2-click task completion for floor teams
See It In Action
Sanitation schedule calendar view in MSS with customizable cleaning frequencies and 2-click task completion for floor teams

Data-Driven Decisions at a Glance

Real-time dashboards show completion rates, task trends, and team performance. Custom reports auto-deliver to stakeholders on the schedule you set.

  • Sanitation, Quality, and Titration dashboards
  • Pre-built and custom report builder
  • Automated email distribution
  • Always audit-ready documentation
Schedule a Demo
MSS analytics dashboard with sanitation, quality, and titration testing trends in real time for food manufacturing

Procedures, CAPA, and Full Traceability

Upload and manage all your SOPs, link them to tasks, and track corrective actions with full root cause analysis. Everything is logged and audit-ready.

  • Procedure creation and version tracking
  • Corrective & Preventative Action workflows
  • Root cause analysis with photo evidence
  • PPE requirements and chemical tracking
Learn More
Current MySitesSupervisor corrective and preventive actions record showing CAPA stages, linked failures, ownership, and issue identification
500+
Schedules Managed
2-Click
Task Completion
100%
Cloud-Based
24/7
Dedicated Support

Pay Only for What You Need

No bloated packages. No paying for features you'll never use. Turn on the capabilities your facility needs, and only pay for those. It's that simple.

Sanitation

The foundation

  • Master Sanitation Scheduling
  • Task Tracking & Completion
  • Dashboard & Reporting
  • User Management

Quality

Inspection & testing

  • Pre-Op Inspections
  • ATP Random Testing
  • Environmental Monitoring
  • CAPA Tracking

Pay for What You Need

Build your perfect package

  • Facility Mapping
  • API Integrations
  • Procedures & SOPs
  • Custom Reports

Coming Soon

On the roadmap

  • Maintenance Management
  • And more to come
  • Same platform, same login, same price model

Contact us for custom pricing based on your facility size and the features you need. No contracts. No hidden fees.

Built by Supervisors, for Supervisors

We've been in your shoes. MySitesSupervisor was designed by people who've managed Food safety challenges firsthand.

Ongoing Updates

We constantly improve the platform with real-time solutions based on customer feedback and industry trends.

Hands-On Onboarding

We work with you to set up a successful program that's easy to manage and update as your team grows.

Cost-Effective

Pay for what you need, not what you don't. Our modular approach means you get maximum value without overpaying for unused features.

Expert Solutions

With firsthand experience managing food safety teams, we've designed our platform to address real-world challenges on the floor.

AI Assistant

Built-in AI helps your team work smarter with intelligent suggestions, automated insights, and faster decision-making across every module.

Single Source Insight

All your sanitation, quality, and maintenance data in one place. No more juggling spreadsheets, emails, and disconnected systems.

Even More Built In

MSS unlimited user management — assign roles and departments across sanitation, quality, and maintenance teams

User Management

Add unlimited users, assign roles and departments, and control access across your facility teams.

MSS API integrations with ChemStation Hygiene and third-party tools to automatically import ATP and lab results

API Integrations

Connect to ChemStation Hygiene API and other third-party tools to automatically import test results.

Random ATP testing configuration in MSS with custom frequencies and Zone 1–4 parameter setup for environmental monitoring

Random Testing

Configure randomized testing programs with custom frequencies, ATP parameters, and completion windows.

Frequently asked questions

The things food-safety and plant teams ask us most.

How does MySitesSupervisor pricing work?

Every plan includes unlimited users — you never pay per seat. Pricing is modular: you turn on the capabilities your facility needs — Sanitation, Quality, and soon Maintenance — and pay only for those. Your final price is based on your facility size and the modules you enable, with no long-term contracts. Contact us for a quote.

Do I have to buy the whole platform at once?

No. MySitesSupervisor is modular. Most plants start with Sanitation Management and turn on Quality (Pre-Op, ATP, environmental monitoring) or Maintenance later — all on the same login, with no migration. You only pay for what you switch on.

Does it work on the plant floor and on mobile?

Yes. MSS is mobile-first and built for the floor — 2-click task completion, QR scanning of equipment and areas, and photo capture, all from a phone or tablet with gloves on. There's no walking back to a computer to log work.

How is MSS different from enterprise EHS platforms?

MSS was built by sanitation and food-safety supervisors for food and beverage plants specifically — not a general enterprise EHS suite retrofitted for the plant floor. That means unlimited users instead of per-seat licenses, modular pricing instead of an all-or-nothing package, and onboarding measured in days, not months.

Will MSS help us stay audit-ready for SQF, BRC, and FSMA?

Yes. Records are captured in real time with timestamps and signatures, corrective and preventive actions (CAPA) are tracked to closure, and reports export in the format auditors expect. The goal is a program where audit day is just another shift.

What kinds of facilities is MSS built for?

Food and beverage manufacturing — including dairy, bakery and snack, meat and poultry, cold storage, beverage, contract sanitation, and pet food operations.

How long does it take to get started?

Most plants are up and running in days, not months. Onboarding is hands-on: we help you build your master sanitation schedule, load your procedures, and get your team completing tasks quickly.

Ready to See What's New?

MySanitationSupervisor has evolved into something bigger. Let us show you everything MySitesSupervisor can do for your facility.

💰What is paper sanitation + pre-op costing?